Hiring a digger to cut a trench or excavate for landscaping in Melbourne’s east? Start with how deep the bucket needs to go, how far it has to reach and where the machine can stand. CMK lists the Wacker Neuson EZ17 compact excavator. Its specifications show why the machine’s size alone doesn’t tell you whether it will suit the dig.
Check digging depth and reach together
Wacker Neuson lists maximum digging depth and reach at ground level separately. The manufacturer also lists different figures for short and long arms. Tell the hire team how deep you need to dig and how far the dig is from where the machine can stand. Ask whether the proposed setup can reach that depth at that distance rather than relying on either maximum on its own.
Check space to get in and space to swing
The EZ17’s tracks have different widths when retracted and extended. Measure the gate and the width of the area where the digger will work. A gate wide enough for access doesn’t tell you whether there’s room to work.
The EZ17 has a zero-tail design and an arm that can swivel independently of the upper body. Zero tail describes the rear of the machine, not how much room the boom and bucket need to swing. If the trench runs beside a wall or fence, show where it runs and where the machine could stand so the hire team can check arm alignment and clearance.
Match the bucket to the trench, not just the machine
Include the trench width when asking about a digging bucket. WorkSafe Victoria advises checking that the attachment and hitch are compatible with the excavator. Confirm the bucket and hitch for the machine you’re hiring rather than assuming the same bucket fits any digger.
If a pipe or pit also needs to be lifted into place, raise that separately from digging the trench. WorkSafe Victoria distinguishes digging from lifting suspended loads. Ask the contractor responsible for the lift to assess which equipment is suitable, rather than assuming a digger that can cut the trench can also place the pipe or pit.
For digger hire in Melbourne’s east, send CMK the planned depth and width, the distance from the machine’s proposed position and photos of the access and work area. Include the position of any wall or fence alongside the dig.