If the same pothole keeps coming back in a crushed-rock driveway, check where water sits after rain and whether the driveway feels soft in that spot. A worn surface, a low spot that holds water and a weak base need different repairs.
Look for water in the wheel tracks and at the driveway edge
Unsealed-road engineering guidance explains why potholes often form in low wheel tracks. Standing water seeps into the aggregate, and tyres can dislodge more material each time they pass through. Take a photo of the low spot while water is still visible so you can show where the damage starts.
Look beyond the hole as well. Federal Highway Administration guidance distinguishes getting water off an unsealed surface from getting it away from the edge. The driveway may have lost its side-to-side fall, or water may be pooling beside it and softening the edge. Filling the hole alone won’t change either of those conditions.
Work out whether the damage is in the surface or the base
If the gravel has worn away but the base below is still firm, reshaping or replacing the surface layer may be enough. If the ground beneath the base is exposed or deep wheel ruts return after grading, ask whether the affected section needs base work before more rock goes on. Note if the same tracks regularly carry loaded trailers or delivery vehicles. Vehicle weight and how often they use the driveway affect surface wear.
Check whether water is backing up at the street
If there’s a pipe under your driveway crossing, check whether water is backing up around either end. Yarra Ranges Council distinguishes private driveway crossings and their culverts from council-maintained culverts under the road. If the work involves installing or modifying a crossing in the road reserve, check the council’s Works Permit requirements before arranging the work.
If the same spots keep failing, see CMK’s crushed-rock driveway preparation. For work in Melbourne’s east or the Yarra Valley, send CMK photos of the potholes, wheel ruts and where rainwater collects so the team can discuss possible groundwork or grading.